Skip to content
Free delivery across India · Pay online, or on delivery · 2-year warranty

On your wall in 30 minutes

Four holes in the wall, then plug it in. Any electrician or carpenter can fit an Antioch rail in about 30 minutes.

In the box

  • The heated towel rail, with its power cord and plug
  • 4 legs and 4 wall mounting brackets
  • 4 wall plugs and 4 countersunk screws
  • 4 machine screws and 4 grub screws
  • 1 allen key

You will need

  • A drill with 6 mm and 12 mm bits
  • A cross-head screwdriver
  • A spirit level, tape measure and pencil
  • A 3-pin socket within reach of the cord

Six steps

  1. Free the brackets. Loosen the grub screws with the allen key and take the mounting brackets out of the legs.
  2. Fit the legs. Attach the four legs to the rail with the machine screws.
  3. Mark the wall. Hold the rail level against the wall and mark where the four legs sit. Masking tape on the wall makes this easier.
  4. Drill and plug. Drill a hole at the centre of each mark and push in the wall plugs. Screw the four brackets to the wall.
  5. Hang the rail. Slide the legs over the brackets and tighten the grub screws. A second pair of hands helps.
  6. Plug in. Connect the plug to the socket and switch on.

Good to know

  • Fit the rail so its lowest bar is at least 600 mm above the floor, out of reach of very young children.
  • Use an earthed socket, away from direct shower spray.
  • Check the box when it arrives and tell us within 7 days if anything is missing or damaged.

Stuck on a step? WhatsApp us a photo and we will help.